The staff performing this activity must be integrated into the team.
Usage
Usage Notes
Testing must occur throughout the process and
throughout each iteration. It is not some final inspection to be done at the end. As requirements are de
veloped and integrated into the build they should be tested as soon as possible.
Key Considerations